Chillin' Out


The dogs enjoying the new deck.


Tuesday, August 28, 2012

New Heating System


The heating system has been replaced. We were told that this high efficiency system should reduce our oil and electric consumption. I hope that is true.

The hot water tank is much smaller than the original one. Supposedly, the system heats water so quickly, that a bigger tank is not needed. The smaller tank is also more energy efficient.

The install took one day. Two plumbers arrived at 7:30 am and an electrician arrived at 1:00 pm. Cold water was available during the installation, which made being in the house much easier.

When the heat was turned on to test the system, Coop, Otis and I began to roast. Extra heat on a 90 degree day is a too much!

Monday, August 27, 2012

Congratulations, Jeff !



The Connecticut State Sporting Clays Shoot was held at Fairfield County Fish and Game this weekend.

Jeff won the Class A FITASC event! Jeff started shooting FITASC in April 2011.  He has made great progress in a little over a year.


Sunday, August 26, 2012

Oil Burner


This is our existing 30+ year old oil burner. Back in May, we realized that the furnace needed to be replaced.

With Fall and colder weather approaching, we knew it was time to order a new heating system. We are also having the electric water heater removed. The new furnace will supply the hot water.

The installation is supposed to take 1 day. I am hoping we do not encounter any install issues. It is tough to live in a house with no running water.

Friday, August 24, 2012

New Door


The new basement door is installed. This is Cooper's favorite spot. Coop loves being able to see outside.

Thursday, August 23, 2012

New Windows



The basement and garage windows are installed. These Andersen windows match the windows on the first floor of the house.



Wednesday, August 22, 2012

Deck Complete

The deck is finished.


Aerial views of the deck, shot from an upstairs window.

We are very happy with the way the deck turned out.  .

Tuesday, August 21, 2012

Garage Window


These are the existing windows in the garage and basement.As you can see they are in bad shape.  The previous owner, replaced one of the panes with a piece of wood. He then drilled a hole in it to run electrical wire outside! I always wonder what the previous owner was thinking when he was doing "home (not) improvements".


We are having the windows replaced while the deck is built.

Monday, August 20, 2012

Almost Done

The deck is almost finished.
 
All that is left to complete are the stairs and gate.


This is what the deck looks like.

Sunday, August 19, 2012

Basement Door

We replaced the basement door shortly after buying the house. However, due to the constant moisture and lack of sunlight, the outside frame was starting to rot. While the deck is being built, we are having a new door installed. The frame is made of a composite, that should last forever.


The new door is all glass. Cooper will love being able to see outside. I hope  the quality is as good as the sales person claims.

Saturday, August 18, 2012

Progress


Most of the floorboards have been installed. I like that the builder put an "edge or frame" on the outer rim of the deck and then installed the floorboards on a diagonal within the frame.


The railing is also starting to be installed.

Friday, August 17, 2012

Posts

The railing posts are installed. The floorboards are starting to be installed. We chose to run the flooring on a diagonal, instead of the traditional horizontal.

Thursday, August 16, 2012

Framing

The framing for the deck is almost complete.

The new 32 foot deck is much smaller than the previous one.

Wednesday, August 15, 2012

Footers Ready


The footers have been poured. We are waiting for the lumber to be delivered, so construction can start.

Monday, August 13, 2012

Footers




The footers have been dug and inspected. Deck construction can now begin.


Sunday, August 12, 2012

Ready to Cook

Our oven is finally fixed. I am not sure that I will ever try the self cleaning option again!

Friday, August 10, 2012

Bath Time


Ice cold water does not feel bad on a hot and humid day!


Thursday, August 09, 2012

Deck Demolition


Our old deck has been completely removed.

Tuesday, August 07, 2012

Deck Started



When I arrived home, I was surprised to see a trailer in the driveway.


The railings have been  removed from the deck.

Monday, August 06, 2012

Please feed me

Poor Otis has been sick for the last few days. I am not sure if he caught a virus or ate something he should not have. In any case, Otis needs to be taken out every hour.

We stopped feeding Otis on Saturday to rest his stomach. When Cooper gets fed breakfast and dinner Otis just sits by his bowl, with big sad eyes.

I feel so guilty. Unfortunately, there is no way to explain to Otis that being hungry will help him get better.

Thursday, August 02, 2012

Sunrise

Cooper believes that if the sun is up, everyone should be up. Getting up at 6:00am on Saturday and Sunday is no fun. Bleary eyed we walk down the street. Upon returning home, the dogs get fed. Ten minutes later, Cooper is sound asleep on the bed.

At 6:45, wide awake, Jeff and I look at each other and say what do we do now ? Unlike Coop & Otis, going back to sleep is not an option. The only upside is that the grocery store is not crowded at 7:00 am.