Tuesday, September 04, 2012

Wilton Jewelers


It is rare to find a business that I love and would recommend without hesitancy. Wilton Jewelers is a shop that I am thrilled with.

I have been to Wilton Jewelers several times over the last few months. Howard, the store owner, is a very nice and trust worthy person.

I have been amazed by the high quality work that Wilton Jewelers has performed. A mangled platinum band was restored to near perfection. A chipped diamond was cut and polished making this tired stone sparkle again, while losing very little of the carat weight. Earrings which had lost accent pearls were repaired and look beautiful.

Wilton Jewelers has a wonderful selection of jewelry. The display cases sparkle with diamonds, sapphires, emeralds and rubies.  If you ever need a reliable jeweler, I would suggest speaking with Howard at Wilton Jewelers.

Sunday, September 02, 2012

King Crab


Stew Leonard's is running a tremendous sale on King Crab Legs. I love crab legs, but rarely buy this expensive treat, especially since Jeff does not eat seafood.

I left the store with 6 large legs. It turned out that this was too much crab for dinner for one. I ended up having crab salad for lunch the next day.

Both dinner and lunch were fantastic. The crab was sweet and juicy.  I do have to say that the Costco crab legs tend to be larger. However, their cost is much higher.

Photo by: Northwest Seafood

Friday, August 31, 2012

Chillin' Out


The dogs enjoying the new deck.


Tuesday, August 28, 2012

New Heating System


The heating system has been replaced. We were told that this high efficiency system should reduce our oil and electric consumption. I hope that is true.

The hot water tank is much smaller than the original one. Supposedly, the system heats water so quickly, that a bigger tank is not needed. The smaller tank is also more energy efficient.

The install took one day. Two plumbers arrived at 7:30 am and an electrician arrived at 1:00 pm. Cold water was available during the installation, which made being in the house much easier.

When the heat was turned on to test the system, Coop, Otis and I began to roast. Extra heat on a 90 degree day is a too much!

Monday, August 27, 2012

Congratulations, Jeff !



The Connecticut State Sporting Clays Shoot was held at Fairfield County Fish and Game this weekend.

Jeff won the Class A FITASC event! Jeff started shooting FITASC in April 2011.  He has made great progress in a little over a year.


Sunday, August 26, 2012

Oil Burner


This is our existing 30+ year old oil burner. Back in May, we realized that the furnace needed to be replaced.

With Fall and colder weather approaching, we knew it was time to order a new heating system. We are also having the electric water heater removed. The new furnace will supply the hot water.

The installation is supposed to take 1 day. I am hoping we do not encounter any install issues. It is tough to live in a house with no running water.

Friday, August 24, 2012

New Door


The new basement door is installed. This is Cooper's favorite spot. Coop loves being able to see outside.

Thursday, August 23, 2012

New Windows



The basement and garage windows are installed. These Andersen windows match the windows on the first floor of the house.



Wednesday, August 22, 2012

Deck Complete

The deck is finished.


Aerial views of the deck, shot from an upstairs window.

We are very happy with the way the deck turned out.  .

Tuesday, August 21, 2012

Garage Window


These are the existing windows in the garage and basement.As you can see they are in bad shape.  The previous owner, replaced one of the panes with a piece of wood. He then drilled a hole in it to run electrical wire outside! I always wonder what the previous owner was thinking when he was doing "home (not) improvements".


We are having the windows replaced while the deck is built.

Monday, August 20, 2012

Almost Done

The deck is almost finished.
 
All that is left to complete are the stairs and gate.


This is what the deck looks like.

Sunday, August 19, 2012

Basement Door

We replaced the basement door shortly after buying the house. However, due to the constant moisture and lack of sunlight, the outside frame was starting to rot. While the deck is being built, we are having a new door installed. The frame is made of a composite, that should last forever.


The new door is all glass. Cooper will love being able to see outside. I hope  the quality is as good as the sales person claims.

Saturday, August 18, 2012

Progress


Most of the floorboards have been installed. I like that the builder put an "edge or frame" on the outer rim of the deck and then installed the floorboards on a diagonal within the frame.


The railing is also starting to be installed.

Friday, August 17, 2012

Posts

The railing posts are installed. The floorboards are starting to be installed. We chose to run the flooring on a diagonal, instead of the traditional horizontal.

Thursday, August 16, 2012

Framing

The framing for the deck is almost complete.

The new 32 foot deck is much smaller than the previous one.

Wednesday, August 15, 2012

Footers Ready


The footers have been poured. We are waiting for the lumber to be delivered, so construction can start.

Monday, August 13, 2012

Footers




The footers have been dug and inspected. Deck construction can now begin.


Sunday, August 12, 2012

Ready to Cook

Our oven is finally fixed. I am not sure that I will ever try the self cleaning option again!

Friday, August 10, 2012

Bath Time


Ice cold water does not feel bad on a hot and humid day!


Thursday, August 09, 2012

Deck Demolition


Our old deck has been completely removed.